Published on September 25, 2013 in Dover Greens Project ProgressFull resolution (1024 × 768) ← Previous Next → Brewster Street, the road in front of the buildings running parallel to Route 22, was newly paved. Brewster Street, the road in front of the buildings running parallel to Route 22, was newly paved.